Thursday, October 25, 2012

CAMEO IMPROVEMENTS PART 1

Thursday, October 25 - On Saturday, Paul did some “remodeling” projects on the Cameo. First up was installation of adjustable shelves in the closet he'll use for his clothes. Paul needs very little “hanger” space. Most of his clothes are easily stored on shelves.

Paul's closet.
Paul working on his closet.

Finished product.
Finished product

He also switched clothes rods in Marsha's closet. The 5th wheel came with a “slotted” rod. Marsha prefers a more traditional rod (smooth). She can get lots more clothes on this type of rod.... :-)

Old rod.
old rod

New and improved rod.
Marsha's rod.

One skimpy towel rod in the bathroom just isn't going to serve us very well. Paul installed two additional rods on the door, a hand-towel ring next to the sink, and an additional hook for hanging a towel while showering.

Empty bathroom wall.
bathroom wall

This door needs some attention.
bathroom door

Solution to our towel hanging problem.bathroom hangers

Paul finished up his work day by trimming a silverware tray so that it fits nicely in the drawer.

Remodeling Part 1

We have several more “remodeling” projects planned for the 5th wheel, so stop back and see what Paul gets himself into.

Thanks for stopping by. Hope to see y'all back real soon. Have a great day!