Showing posts with label Alabama...Red Bay. Show all posts
Showing posts with label Alabama...Red Bay. Show all posts

Wednesday, July 27, 2011

THAT'S A WRAP!!!

Wednesday, July 27 – We finally left Red Bay behind and drove five hours to Cave City, KY. We are just staying the night at Singing Hills RV Park. We are in Site 42.

1-front

4-front

On both sides of us.
2-down-road

3-other-way

Beth, the hostess, is extremely nice and helpful. This isn't a fancy campground at all. We paid $16 using our Passport America card. Beth gave us a super detailed handout of  the closest laundry, shopping, churches, etc.

We weren't here for sightseeing but did take a short ride to Mammoth Cave, In order to even see the front of the cave, we had to take a tour. We passed.

It is off to Cincinnati, Ohio tomorrow. We will be in EST for the first time since last July.

YESTERDAY - To finish are repairs here at the Tiffin Motor Homes repair facility, they literally wrapped our MH in plastic wrap. All in preparation for painting the new roof rails that were installed yesterday.

2-mh-in-garage

3-mh-wrapped

4-close-up

We were sent to Red Bay Paint & Body, a local RV Paint Shop owned by a former Tiffin employee, to have the painting done. This is a common practice employed by Tiffin when they are very busy. Sure helps out the local businesses!

We were at Red Bay Paint & Body by 7 a.m. and were told to return after lunch to pick it up. This was one repair we weren't able to watch since most of the work took place in the paint booth.

After enjoying a leisurely breakfast at a local dinner (good way to kill some time when you find yourself homeless) we stopped at the Discount Wholesale Food Mart. This market specializes in “scratch & dent” food products. We were careful in what we purchased, isolating our purchases to canned goods that we could see were in good condition. We only picked up about a half dozen cans of chopped chicken white meat for making chicken salad, at half the normal price.

We then went over to the Tiffin Manufacturing facility to look at the 2012 Motor Homes fresh off the assembly line. They have many beautiful improved features, many of which we would love to have, but not on our budget....LOL

We then returned to the Tiffin Repair waiting room to enjoy the air conditioning while we waited for our painting to be finished. Shortly after noon, we returned to the painter, backed our MH out of the shop and settled into our campsite for the night.

New painted rails…no wrinkles, no cracks!
5-all-done

6-doen

Paul went over to the business office to settle our bill. We were pleasantly surprised with the final figures. The majority of our repairs were covered by the Tiffin Extended Warranty. Our biggest expense was the upgrades we had performed out at Custom RV which consisted of the refrigerator inverter and new batteries.

So tomorrow morning we pull out of Red Bay, AL and head for family visits in Ohio. If all goes well, we plan on being there by this weekend. We're going to make the trip in three short driving days, stopping in Cave City, Kentucky – site of Mammoth Cave; Cincinnati, OH where we'll stay free in the Family Motor Coach Association (FMCA) campground; and then finally somewhere in Canton, OH. We figure on staying about a month in Canton, but aren't sure where. Funny that Canton is our former hometown, but we can't find a camp site.....JEESH! Very slim pickin's!!!

Thanks for stopping by. Hope to see ya'll back real soon. Have a great day!

Monday, July 25, 2011

ROOF RAILS REPLACED…THANKS TIFFIN MFG.

Monday, July 24 – We got into Service Bay #17 this morning at 7a.m. to have the roof rails replaced on our motorhome.

1-in-bay

This is the caps where the roof meets the sidewalls. They are made of fiberglass, as is the roof, and Tiffin has found they do not hold up and become wrinkled and could begin to leak. As a result, they are replacing them under their ten year structural warranty.

2aa-bad-rail

2a-bad-rail

All set up and ready to begin.
1-set-up

They begin by cutting out the old fiberglass rails. Surprising this fiberglass is not very thick. Probably only about a quarter inch thick. They just cut it out and peel it back like a banana.

3b-cutting-off-rail

3c-tearing-off-rail

Once the old is removed, they form the aluminum using a machine much like seamless home gutters are manufactured.

7-rail-maker

8-rail-coming-out-of-machin

New piece ready to be installed.
5-paul-holding-new-rail

6-thickness-of-rail

They then slide the new aluminum rails under the roof edge and over the lip of the wall. This is then screwed and glued into place.

All areas are then caulked and allowed to dry over night or longer, before painting.

13-complete-rail

12-complete-rail

11-complete-top-rail

We are being sent to a private contractor in town for the painting. Custom Paint & Body, owned by a former Tiffin employee, will be doing the painting. By going there, we were able to eliminate waiting time and get the job finished tomorrow. We also have a couple spots they are going to touch up while in the paint booth.

Marsha and Bella (our cat) stayed in the MH during this repair. Poor Bella. The grinding and cutting tool must have scared her to death. They do have a waiting room, but there are too many people with pet dogs that scare are tiny kitty. She hid under the bed in the MH and gutted it out.....LOL!

Thanks for stopping by. Hope to see ya'll back real soon. Have a great day!

Saturday, July 23, 2011

FIRST LADY OF COURAGE…HELEN KELLER

Saturday July 23 – YES, we are still in Red Bay. BUT…we were told last evening that we are going in Bay #17 on Monday morning at 7….YIPEEEEE! They will do the rails on Monday and then paint on Wednesday…at least that is how it is suppose to work. If all goes according to our plan, we will leave for Ohio Thursday morning. 

We visited Ivy Green, birthplace of Helen Keller, June 27, 1860, in her hometown of Tuscumbia, Alabama. Listed on the National Register of Historic Places, Ivy Green was built in 1820 by grandparents of Helen Keller. It was the second house erected in Tuscumbia.

1-front-of-house

Helen Adams Keller was born a healthy child on June 27, 1880, to Captain Arthur H. and Kate Adams Keller of Tuscumbia. At the tender age of 19 months, she was stricken with a severe illness which left her blind and deaf.

At the age of six, the half-wild, deaf and blind girl was taken by her parents to see Dr. Alexander Graham Bell. Because of her visit, Helen was united with her teacher Anne Mansfield Sullivan on March 3, 1887.

Picture below taken from official website.
image

The main house is of Virginia-cottage construction, with four large rooms on the first floor bisected by a wide hall. Each room has an individual fireplace.

Master Bedroom…The clothing in the wardrobe are Helen's and her mother's, Kate. 19-helen-dresses

If you have ever watched the movie, "The Miracle Worker", you will recall the scenes of Helen eating off of everyone's plates at meal time. Helen broke all but two original pieces of china.
17-kitchen

Upstairs housed the boy's room, Helen and Annie Sullivan's room and a trunk room.

The famous well pump is located between the main house and the birthplace cottage, which is situated just east of the main house. At this well, Annie revealed the mystery of language to seven-year-old Helen, by spelling the word w-a-t-e-r into one hand and letting the water flow over the other hand. As the brochure reads…Darkness began to melt from her mind like ice left out on that sunny March day. By nightfall, Helen had learned 30 words. This is just amazing to us!
4-well

5-helens-house

The bedroom of Helen and Annie in the cottage.
6-helen-bedroom

Her playroom and classroom.
7-helens-playroom

After Helen's miraculous break-through at the simple well-pump, she proved so gifted that she soon learned the fingertip alphabet and shortly afterward to write. By the end of August, in six short months, she knew 625 words. By the time she was 16, Helen could speak well enough to go to preparatory school and to college. In 1904 she was graduated "cum laude" from Radcliffe College.

The home contains hundreds of mementos of Miss Keller's life including her library of Braille books and old Braille typewriter.

Helen placed a ruler on the page as a guide and drew very square block letters.
26-line-for-writing

Sample of her writing just one year after she learned to communicate by signing the manual alphabet.
29-example-of-writing

The grounds were lovely. The buildings are surrounded by English boxwood, over 150 years old.  Here is a small taste of the beautiful flowers in bloom. Marsha was in heaven!
Helen Keller

Upon Helen's death, hundreds of countries sent items in Helen's memory to be included in the garden. Here is one example from Japan.
11-gift-from-japan

Helen Keller, the little girl, became one of history's remarkable women. She dedicated her life to improving the conditions of blind and the deaf-blind around the world, lecturing in more than 25 countries on the five major continents. Wherever she appeared, she brought new courage to millions of blind people.

A SIDE NOTE: In the back gardens, stands the "Moon Tree." The "Moon Tree" was grown from seed that journeyed to the moon and back aboard Apollo 14 during the period of January 1-February 9, 1971. It was presented to "The Cleaning" at Ivy green in October, 1976. The "Moon Tree" is a loblolly pine. OH NO…it is that word again…PINE…as in PINE NEEDLES!

12-moon-tree

While Paul was off some where far away, Marsha had an idea. She went into the Museum told the ladies about her pine needle basket and asked if she could collect some the of the needles. The ladies enjoyed her story and gave her a bag for her collection. When she got to the car, she explained her idea to Paul. Paul was shocked that she could come up with such a cool, Marsha's words not Paul's, idea. "What is this ingenious idea," you ask. Marsha is going to spray paint the needles a metallic gold and weave one needle in each of her baskets. She then will print a little card explaining why the needle is included in the basket. She says, her family member and friends will now have a memento of something that went to the moon! Again, the littlest things make her so happy.

According to Marsha, this Museum is one of her highlights of our travel. We do agree, it is a place to put on your bucket list.  We are Blessed to have our sight and hearing and cannot come close to accomplishing what this amazing woman did!

As we drove back to the Tiffin Campground, this is what the sky looked like…YIKES!drive-home-sky_cornith

Back at the motorhome, our sky looked like this….but no rain the entire night.
sky-rain-red-bay

Thanks for stopping by. Hope to see ya'll back real soon. Have a great day!

Thursday, July 21, 2011

MORE HOME IMPROVEMENTS

Wednesday, July 20 - No use sitting around here (Red Bay) doing nothing! So, Paul decided to replace the material on the awning over the door. It started unraveling about a year ago and is just about trashed now.

1-old-awning

He bought the new material at the Tiffin Parts Store the other day and was going to wait for a cooler location to do the work, but might as well get it over with!

He removed the old material, and when he started to put in the new, noticed it was the wrong size.

2-paul-old-off

3-old-one

So after three trips down to part, he finally got the right size....GRACIOUS!

5-paul-sizing-new-one

Too bad an extra set of hands didn't come in the box....this was a two man job.

6-starting-new-awning

8-starting-side-view

But a friendly neighbor came over and helped re-install the awning roller as Paul threaded the material on the other end and the rest went smoothly.

9-help

Now that should be good for another six or so years!

10-done

11-final-project

One of those jobs that should have taken a couple hours but between getting the wrong parts and having every man in the park stop to talk, it took about five hours. When you get all these men in his maintenance park waiting for service, they have to get out, walk around, and see what the heck other guys are doing on their motorhomes. A man's work is never finished! :=)

A second job, Paul decided to tackle while waiting on service is replacing the fog lights. Both lights have been hit by rocks, and Paul had the lens covered with clear packing tape.

1-bad-one

2-other-bad-one

So since the parts store is right here, might as well replace them. You would think you could just replace the bulbs or the lens cover, oh no! You have to replace the entire fixture. More junk for the landfills, I guess.

It wasn't a complicated task. Remove the old fixture with the broken lens. Unplug the wiring harness.

3-paul-under-mh

Plug in the new light fixture and bolt it back in place.

4-pretty-new-one

Wouldn't have been a bad job if it was so dang hot and humid....LOL

Thanks for stopping by. Hope to see ya'll back real soon. Have a great day!