Friday, May 24, 2013

IT'S DONE!!!

Monday, May 20 – Paul is happy to report that the bathroom renovation is completed.....whew! That was a bigger job then he expected. At least is took longer than he planned, but it's now done and looks wonderful.

One of his last jobs was to crawl up in the attic and attach a pipe to the exhaust fan to vent it outside. He had to do some serious squeezing to get that done, that's why he put it off to the end of the remodel. Actually, it went well and the job wasn't too bad. Marsha loves it!

paul in attic

Some photos of the finished product. Window coverings have been order.

Out with the old.
old bathroom

In with the new.
DSC05120

toilet area

vanity

shower

A well-deserved rest after a very big project.
paul sleeping

The driveway guy is suppose to be coming before the end of the month. That's the next big job Paul really wants to get done around the house. A nice apron for backing in from the street and a nice gravel area for parking the 5th wheel and his truck. Eventually he wants to run electric out to the RV parking area.

Paul couldn't sit idle very long. After running errands during the morning, he came home and started the demolition of the old sun porch. This is a real eye soar, and it will be nice to be rid of it. It's all aluminum so Paul will load the scrap in his truck and see what they'll pay him for it at the recycle center.

Ugly sunroom.
sunroom

We think this carpeting is a throw back from the '60's.floor

windows gone

roof coming down

It didn't take long (about a day and a half) to finish the demolition of the sun porch. The rear of the house looks so much better without that eyesore. It opens up the area allowing more sunlight to enter the kitchen and improves the view out the kitchen window immensely. Now to fix that wall and try to remove all that glue on the cement.

DSC05101

Now what does Marsha have next on his “honey-do list?” We have some grass to plant around the house so that would be a great “next job” for Paul. He needs a little break before beginning another BIG job.

Hopefully, our next post will be about the completion of the driveway.

Thanks for stopping by. Hope to see y'all back real soon. Have a great day.

 

Monday, May 20, 2013

NEW WINDOW AND CULVERT ARE IN.

Wednesday, May 15 - Paul replaced the bathroom window. All the windows in the house will be replaced eventually, but Paul figured we should replace this one while we have things torn up.

Bathroom window is middle window.DSC09989

So much nicer.
DSC05001

The township also showed up recently to lengthen the culvert under the driveway. We have a pretty narrow street and a very narrow driveway. That doesn't sit well with an RV owner. We struggled to get the 5th wheel in it's parking space when we arrived in late April. So we had the township lengthen the culvert by nearly 20 feet. They do it for residents charging only for materials. For us the total cost was $161. Later this month, Paul has an asphalt company coming out to blacktop the area creating a nice apron for backing in the 5th wheel.

lengthening colvert

Looks like some guy in the gray shorts decided to become the supervisor. DSC04890

Marsha couldn't believe this guy was smoking a cigarette and using a blow torch. She thinks he is nuts!

cutting pipe

culvert in place

They did a very nice job.

Bella has been keeping very busy loving the outdoors. She loves finding different places to hide. She enjoys watching the birds.

bird on feeder

Marsha follows the rope. Bella has to be around here somewhere.DSC04857

This is a new hiding place for her.bella in window

There is the rope again, but where is Bella.
rope

Great hiding place, Bella. Can't even see you.bella in grass

Oh, there you are!
Bella in grass

Thanks for stopping by. Hope to see y'all back real soon. Have a great day!

Saturday, May 18, 2013

TILE DAY!

Saturday, May 11 – Dave, our daughter Kelly's boyfriend, came over this morning to help Paul tile the bathroom. Dave has laid tile quite a few times and volunteered to “help” Paul with the tile laying project – actually he was the tile man, and Paul was the tile cutter.

The floor ready for the tile.
bathroom floor

After a few layout calculations, Dave started marking tiles to be cut and laying them as fast as Paul could keep up.

Dave teaching Paul how to cut the tile.
dave tile cutting

Paul practicing.
paul cutting tile

Dave shows Paul how to mark the tiles for cutting.
mark tiles

The cutting went well with only a few broken corners that Dave was able to use in other places.

The first piece. Mud.
mud

Mud mixer.
DSC04950

laying first tile

Dave zoomed right along and within 4 hours the tiling was completed.

DSC04962

Dave gave Paul the honor of laying the last tile.

paul laying tile

What a beautiful job! Dave sure did great installing the tile floor.

tile floor

We are so pleased! Thanks Dave for a job well done!

We let the floor dry for a couple days and on Monday, Paul spread the grout between the tiles. That was easy and went pretty well. That will dry overnight and Paul can start finishing things up.

grout

The finished product. We love it!

DSC04985

While the grout was drying, Paul converted the hall closet that contained the old washer and dryer, to a nice storage closet for Marsha.

Old
paul looking at old closet

New
new closet

Marsha is thrilled with her new closet.

Paul has a little plumbing and electric to do before installing the vanity, then he'll install the medicine cabinets, lights, towel bars, shower curtains, finish up installation of the exhaust fan and install baseboards and window & door trim. Stay tuned for the next adventure.

Thanks for stopping by. Hope to see y'all back real soon. Have a great day.